{"id":4104,"date":"2019-09-26T06:09:25","date_gmt":"2019-09-26T06:09:25","guid":{"rendered":"http:\/\/muestra.vansterandlei.com\/?p=4104"},"modified":"2019-11-15T11:30:03","modified_gmt":"2019-11-15T11:30:03","slug":"esteyco-participa-en-la-construccion-del-syvash-wind-power-plant-swpp","status":"publish","type":"post","link":"http:\/\/muestra.vansterandlei.com\/es\/esteyco-participa-en-la-construccion-del-syvash-wind-power-plant-swpp\/","title":{"rendered":"ESTEYCO  PARTICIPA EN LA CONSTRUCCI\u00d3N DEL SYVASH WIND POWER PLANT (SWPP)."},"content":{"rendered":"Esteyco est\u00e1 asistiendo a Power China en la revisi\u00f3n de distintos aspectos referentes a la Obra Civil del Proyecto Syvash Wind Power Plant (SWPP). El parque e\u00f3lico SWPP, ubicado en las inmediaciones del Mar de Syvash (Kherson, Ucrania), contar\u00e1, tras su construcci\u00f3n, con un total de 63 posiciones y 250 MW de capacidad instalada. Esto har\u00e1 del SWPP el parque e\u00f3lico m\u00e1s grande de Ucrania. Debido a que los trabajos de ejecuci\u00f3n de los viales y las cimentaciones se est\u00e1n desarrollando en la actualidad, Esteyco tiene destinado en campo personal para coordinar los trabajos con los distintos equipos de ingenier\u00eda de sus oficinas de Madrid y Barcelona.<\/p>\n<p>Entre otros trabajos, Esteyco ha dise\u00f1ado y supervisado una campa\u00f1a geol\u00f3gica y geot\u00e9cnica, a fin de obtener la informaci\u00f3n necesaria para redefinir aspectos relativos a los viales del parque e\u00f3lico.<\/p>\n<p>Esteyco ya particip\u00f3 en fases anteriores en el Proyecto SWPP, concretamente en la revisi\u00f3n del dise\u00f1o de detalle de las cimentaciones pilotadas y en la optimizaci\u00f3n del pavimento de los viales del parque.<br \/>","protected":false},"excerpt":{"rendered":"<p>Esteyco est\u00e1 asistiendo a Power China en la revisi\u00f3n de distintos aspectos referentes a la Obra Civil del Proyecto Syvash Wind Power Plant (SWPP). El parque e\u00f3lico SWPP, ubicado en las inmediaciones del Mar de Syvash (Kherson, Ucrania), contar\u00e1, tras su construcci\u00f3n, con un total de 63 posiciones y 250 MW de capacidad instalada. Esto &hellip; <a href=\"http:\/\/muestra.vansterandlei.com\/es\/esteyco-participa-en-la-construccion-del-syvash-wind-power-plant-swpp\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> \u00abESTEYCO  PARTICIPA EN LA CONSTRUCCI\u00d3N DEL SYVASH WIND POWER PLANT (SWPP).\u00bb<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":4111,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pgc_sgb_lightbox_settings":""},"categories":[175,7,21,154,12,149,5,156,1,155,22],"tags":[],"wps_subtitle":"","_links":{"self":[{"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/posts\/4104"}],"collection":[{"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/comments?post=4104"}],"version-history":[{"count":0,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/posts\/4104\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/media\/4111"}],"wp:attachment":[{"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/media?parent=4104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/categories?post=4104"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/muestra.vansterandlei.com\/es\/wp-json\/wp\/v2\/tags?post=4104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}